Current through October 31, 2024
Section 329 IAC 10-11-5.1 - Renewal permit applicationAuthority: IC 13-14-8-7; IC 13-15; IC 13-19-3
Affected: IC 13-20-21; IC 36-9-30
Sec. 5.1.
(a) In addition to the application requirements given at section 2.1 of this rule, excluding section 2.1(c)(3) of this rule, a complete application for a renewal of a solid waste land disposal facility permit must include all the following information: (1) The name and address of all owners or last taxpayers of record of property of adjoining land that is within one-half (1/2) mile of the solid waste boundary.(2) The operation permit number of the solid waste land disposal facility.(3) The number of acres permitted for waste disposal.(4) A topographic plot plan that reflects the current condition of the solid waste land disposal facility and current elevations taken within twelve (12) months of the submittal of the application and accurately identifies the following information to a scale as required by 329 IAC 10-15-2(a), 329 IAC 10-24-2(a), or 329 IAC 10-32-2(a): (A) Areas of final cover, including certified closed area, and type of final cover.(B) Filled areas lacking final cover, grading, and seeding.(C) Current areas of operation.(D) Projected solid waste disposal areas on a per year basis for the next five (5) years.(5) A copy of the latest approved final contour plot plan with scale, as required by 329 IAC 10-15-2(a).(6) A copy of the latest approved subgrade contours or the uppermost contour of the soil liner.(b) An application for a renewal of a solid waste land disposal facility permit must be submitted at least one hundred twenty (120) days prior to the expiration date of the permit or the permit will be invalid upon expiration.(c) Fees must be submitted with the application in accordance with IC 13-20-21.Solid Waste Management Board; 329 IAC 10-11-5.1; filed Aug 2, 1999, 11:50 a.m.: 22 IR 3791; filed Feb 9, 2004, 4:51 p.m.: 27 IR 1803, eff Apr 1, 2004