Authority: IC 13-14-8; IC 13-15-1-2; IC 13-15-2-1; IC 13-18-3
Affected: IC 13-18-3-15; IC 13-18-4
Sec. 15.
Contemporaneously with the issuance of a final permit under 327 IAC 5-3-14, the commissioner shall transmit a response to each person having commented on the draft permit. This response to comments shall contain:
(1) a brief description of and response to all significant comments on the draft permit raised during the public comment period, or during any hearing;(2) a specific indication of which provisions of the draft permit have been changed in the final permit, and the reasons for the change; and(3) a brief explanation of the right to request an adjudicatory hearing on the final permit.Water Pollution Control Board; 327 IAC 5-3-15; filed Sep 24, 1987, 3:00 pm: 11 IR 641; readopted filed Jan 10, 2001, 3:23 p.m.: 24 IR 1518; readopted filed Nov 21, 2007, 1:16 p.m.: 20071219-IR-327070553BFAReadopted filed Jul 29, 2013, 9:21 a.m.: 20130828-IR-327130176BFAReadopted filed 10/18/2024, 1:57 p.m.: 20241113-IR-327230810RFA