Authority: IC 13-14-8; IC 13-15-1-2; IC 13-15-2-1; IC 13-18-2; IC 13-18-3
Affected: IC 13-11-2; IC 13-13-5-1; IC 13-18-4
Sec. 7.
A POTW not required to develop an approved POTW pretreatment program shall be required to meet the following:
(1) Comply with a decision of the commissioner who has the responsibility of implementing a POTW pretreatment program that will achieve the objectives stated in 327 IAC 5-16-1(b) if the commissioner determines that a need exists for such a POTW pretreatment program. Generally, such a state pretreatment program will be implemented at the local POTW through the use of procedures comparable to those described under section 3(2) of this rule and, ultimately, the issuance of appropriate industrial wastewater pretreatment permits under 327 IAC 5-21.(2) Develop, adopt, and enforce a sewer use ordinance that implements the standards for prohibited discharges in accordance with 327 IAC 5-18-2.(3) Comply with any requirements of the commissioner specified in the POTW's NPDES permit to perform certain elements of an approved POTW pretreatment program, such as monitoring for industrial pollutants in the discharges from the POTW's industrial users.Water Pollution Control Board; 327 IAC 5-19-7; filed Oct 10, 2000, 3:02 p.m.: 24 IR 308Readopted filed 10/18/2024, 1:57 p.m.: 20241113-IR-327230810RFA