Authority: IC 13-14-8; IC 13-15-1-2; IC 13-15-2-1; IC 13-18-2; IC 13-18-3
Affected: IC 13-11-2; IC 13-13-5-1; IC 13-18-4
Sec. 10.
"Industrial wastewater pretreatment permit" or "IWP permit" means a permit issued directly by the commissioner to an industrial user. An IWP permit is not a permit issued by a POTW to an industrial user.
327 IAC 5-17-10