Section 327 IAC 20-4-4 - Permit modificationsAuthority: IC 13-14-8-7; IC 13-15-2-1; IC 13-18-10.5
Affected: IC 13-11-2; IC 13-14; IC 13-15; IC 13-18; IC 13-30
Sec. 4.
(a) The commissioner may issue a SMSS permit modification at any time.(b) Changes to a SMSS requiring a permit modification include the following: (1) Changes that increase storage capacity.(2) Changes to approved design drawings or construction specifications.(3) Any other changes the commissioner determines require a modification.(c) If the change is not one listed in subsection (b), the owner or operator shall submit to the department: (1) a written description of the change; and(2) three (3) copies of any documents submitted under section 1 of this rule with revisions reflecting the change.(d) Fifteen (15) days after submitting a change under subsection (c), an owner or operator may implement the change unless the department provides notification that: (1) additional information is necessary to review the change; or(2) the change requires a permit modification.(e) When requesting a permit modification under subsection (b), the owner or operator shall submit three (3) copies of the request to the department including: (1) a description of the proposed modification; and(2) documents submitted under section 1 of this rule with revisions reflecting the change.Filed 9/28/2015, 11:13 a.m.: 20151028-IR-327130245FRA