Authority: IC 13-1-1-4; IC 13-7-7
Affected: IC 13-1-1; IC 13-7
Sec. 12.1.
Facility Description | Emission Limitations |
Units 1, 2, 3, and 4 Unit 5 | 5.1 |
New source performance standard pursuant to 326 IAC 12 | 1.2 |
Twenty-four (24) hour average | 1.10 |
(1) Facility Description | Emission Limitations |
Units 1, 2, 3, and 4 | |
Beginning January 1, 1992 | 3.57 |
No later than December 31, 1993 | 3.13 |
No later than December 31, 1995 | 2.7 |
Unit 5 | |
Beginning January 1, 1992 | |
New source performance standard pursuant to 326 IAC 12 | 1.2 |
Twenty-four (24) hour average | 1.10 |
No later than December 31, 1995 | 1.10 |
(2) Facility Description | Emission Limitations |
Units 1, 2, and 3 | |
Beginning January 1, 1992 | 3.57 |
No later than December 31, 1993 | 3.13 |
No later than December 31, 1995 | 3.19 |
Unit 4 | |
Beginning January 1, 1992 | 3.57 |
No later than December 31, 1993 | 3.13 |
No later than December 31, 1995 | 0.60 |
In order to achieve compliance with the sixty-hundredths (0.60) pounds per million Btu emission limitation for Unit 4, PSI shall install and operate a flue gas desulfurization (FGD) system on Unit 4 as follows:
Unit 5 | |
Beginning January 1, 1992 | |
New source performance standard pursuant to 326 IAC 12 | 1.2 |
Twenty-four (24) hour average | 1.10 |
No later than December 31, 1995 | 1.10 |
PSI shall indicate in a certified letter to the commissioner whether it intends to comply with the emission limitations and other requirements under either subdivision (1) or (2) by December 31, 1991.
326 IAC 7-4-12.1