Authority: IC 13-14-8; IC 13-17-3-4; IC 13-17-3-11
Affected: IC 13-15; IC 13-17
Sec. 17.
Source | Emission Limits | |
Units | lbs/hr | |
Number 4 slab mill scarfer | 0.039 lbs/ton | 21.97 |
Number 2A bloomer scarfer | 0.107 lbs/ton | 10.70 |
Mold foundry baghouse | 0.011 gr/dscf | 26.00 |
Sinter plant discharge end and cooler baghouse | 0.01 gr/dscf TSP | 11.70 TSP |
Sinter plant windbox baghouse | 0.007 gr/dscf TSP | 17.00 TSP |
Lime plant silo baghouses | 0.085 lbs/ton | 5.530 |
Lime plant firing and kiln baghouses | 0.110 lbs/ton | 7.149 |
Number 4 roll shop ervin blaster/baghouse | 0.0052 gr/dscf TSP | 0.210 TSP |
Number 4 roll shop wheelabrator baghouse | 0.0052 gr/dscf TSP | 0.260 TSP |
Number 4A roll shop ervin blaster/baghouse | 0.0052 gr/dscf TSP | 0.210 TSP |
Number 4A roll shop pangborn blaster/baghouse | 0.0052 gr/dscf TSP | 0.260 TSP |
Number 2 roll shop pangborn blaster/baghouse | 0.0052 gr/dscf TSP | 0.270 TSP |
Number 6 roll shop roll blaster/baghouse | 0.0052 gr/dscf TSP | 0.200 TSP |
Electric shop blasters/baghouses | 0.0052 gr/dscf TSP | 1.070 TSP |
Number 7 blast furnace casthouse (west) baghouse | 0.003 gr/dscf | 11.22 |
Number 7 blast furnace stockhouse pellet baghouse | 0.0052 gr/dscf | 4.00 |
Number 7 blast furnace casthouse (east) baghouse | 0.011 gr/dscf TSP | 22.00 TSP |
Number 7 blast furnace coke screening baghouse | 0.007 gr/dscf TSP | 4.200 TSP |
Number 7 blast furnace stockhouse coke baghouse | 0.01 gr/dscf TSP | 2.00 TSP |
Number 2 basic oxygen furnace number 10 furnace stack | 0.058 lbs/ton TSP | 16.00 TSP |
Number 2 basic oxygen furnace number 20 furnace stack | 0.058 lbs/ton TSP | 16.00 TSP |
Number 2 basic oxygen furnace caster fume collection baghouse | 0.0052 gr/dscf TSP | 2.00 TSP |
Number 2 basic oxygen furnace ladle metallurgical station baghouse | 0.0052 gr/dscf TSP | 2.00 TSP |
Number 2 basic oxygen furnace secondary ventilation system scrubber | 0.015 gr/dscf TSP | 12.00 TSP |
Number 2 basic oxygen furnace tundish dump baghouse | 0.0052 gr/dscf TSP | 2.200 TSP |
Number 2 basic oxygen furnace charging aisle reladling and desulfurization baghouse | 0.011 gr/dscf TSP | 28.30 TSP |
Number 2 basic oxygen furnace truck and ladle hopper baghouse | 0.0052 gr/dscf TSP | 0.800 TSP |
Number 2 basic oxygen furnace flux storage and batch baghouse | 0.0052 gr/dscf TSP | 0.530 TSP |
Number 4 basic oxygen furnace reladling and desulfurization baghouses | 0.0052 gr/dscf TSP | 8.26 TSP |
Number 4 basic oxygen furnace scrubber stack (steelmaking) | 0.187 lbs/ton TSP | 100.00 TSP |
Number 4 basic oxygen furnace vacuum degassing baghouse | 0.01 gr/dscf TSP | 4.280 TSP |
Number 4 basic oxygen furnace secondary ventilation system baghouse | 0.006 gr/dscf TSP | 22.30 TSP |
Stack serving blast furnace stove, number 5 (3 units) | 0.016 lbs/MMBtu | 4.70 |
Stack serving blast furnace stove, number 6 (4 units) | 0.016 lbs/MMBtu | 3.64 |
Stack serving blast furnace stove, number 7 (3 units) | 0.0076 lbs/MMBtu | 6.32 |
Stack serving "A" blast furnace stoves (3 units) | 0.021 lbs/MMBtu | 5.090 |
Stack serving "B" blast furnace stoves (3 units) | 0.021 lbs/MMBtu | 5.090 |
100 inch plate mill reheat furnace | 0.078 lbs/MMBtu | 13.74 |
Number 4 slabber soaking pit numbers 19 through 45 collective | 0.006 lbs/MMBtu | 1.750 |
Stack serving number 2AC station boiler numbers 211 through 213 | 0.018 lbs/MMBtu | 16.20 |
Stack serving number 3AC station boiler numbers 301 through 304 | 0.018 lbs/MMBtu | 16.20 |
Number 3AC station boiler number 305 | 0.018 lbs/MMBtu | 5.400 |
Stack serving number 4AC station boiler number 401 through 404 | 0.042 lbs/MMBtu | 76.578 |
Number 4AC station boiler number 405 | 0.028 lbs/MMBtu | 18.78 |
Stack serving number 5 boiler house (3 units) | 0.013 lbs/MMBtu | 18.05 |
Electric arc furnace shop direct shell evacuation system baghouse roof monitor | 0.0052 gr/dscf | 17.14 |
Electric arc furnace shop ladle metallurgical station baghouse | 0.01 gr/dscf | 0.820 |
Raw coal conveyor transfer baghouse A | 0.003 gr/dscf | 0.17 |
Raw coal storage bin baghouse C | 0.003 gr/dscf | 0.23 |
Coal pulverizer baghouse D | 0.0015 gr/dscf | 0.93 |
Coal pulverizer baghouse E | 0.0015 gr/dscf | 0.93 |
Number 7 blast furnace coal storage bin baghouse F | 0.003 gr/dscf | 0.09 |
Number 7 blast furnace coal storage bin baghouse G | 0.003 gr/dscf | 0.09 |
Numbers 5 and 6 blast furnace coal storage bin baghouse H | 0.003 gr/dscf | 0.09 |
Numbers 5 and 6 blast furnace coal storage bin baghouse H | 0.003 gr/dscf | 0.09 |
Source | Opacity |
Electric arc furnace direct shell evacuation system baghouse | 5%, 6 minute average |
Electric arc furnace shop roof monitor | 20%, 6 minute average |
Electric arc furnace shop ladle metallurgical station baghouse | 5%, 6 minute average |
Number 2 basic oxygen furnace, number 10 furnace off-gas scrubber | 20%, 6 minute average |
Number 2 basic oxygen furnace, number 20 furnace off-gas scrubber | 20%, 6 minute average |
Number 2 basic oxygen furnace caster fume collection baghouse | 5%, 3 minute average |
Number 2 basic oxygen furnace charging isle and reladling desulfurization baghouse | 5%, 3 minute average |
Number 2 basic oxygen furnace flux storage and batch baghouse | 5%, 3 minute average |
Number 2 basic oxygen furnace ladle metallurgy station baghouse | 5%, 3 minute average |
Number 2 basic oxygen furnace roof monitor | 20%, 3 minute average |
Number 2 basic oxygen furnace secondary ventilation system scrubber | 20%, 6 minute average |
Number 2 basic oxygen furnace truck and ladle hopper baghouse | 5%, 3 minute average |
Number 2 basic oxygen furnace tundish dump baghouse | 5%, 3 minute average |
Number 4 basic oxygen furnace off-gas scrubber | 20%, 6 minute average |
Number 4 basic oxygen furnace reladling and desulfurization baghouse | 5%, 3 minute average |
Number 4 basic oxygen furnace roof monitor | 20%, 3 minute average |
Number 4 basic oxygen furnace secondary ventilation system baghouse | 5%, 3 minute average |
Number 4 basic oxygen furnace vacuum degassing material handling baghouse | 5%, 3 minute average |
Number 7 blast furnace casthouse | 15%, 6 minute average |
The system shall provide a minimum of one hundred eighty-five thousand (185,000) actual cubic feet per minute of air flow (fume capture) to each hood when the corresponding tap hole is being drilled or plugged.
326 IAC 6.8-2-17