Authority: IC 13-14-8; IC 13-17-3-4; IC 13-17-3-11
Affected: IC 13-15; IC 13-17
Sec. 10.
RACO-Hubbell Electric Products in St. Joseph County shall meet the following emission limits:
Source | Source ID No. | Point Input ID | Process | Emission Limits | |
tons/yr | lbs/million Btu | ||||
RACO-Hubbell Electric Products | 00008 | 42P | Boiler No. 3 10 MMBtu/Hr. | 3.50 | 0.080 |
43P | Boiler No. 4 10 MMBtu/Hr. | 3.50 | 0.080 |
326 IAC 6.5-7-10