Authority: IC 13-14-8; IC 13-17-3-4; IC 13-17-3-11
Affected: IC 13-14-4-3; IC 13-15; IC 13-17
Sec. 3.
All components requiring calibration shall be calibrated within sixty (60) days prior to the actual test date. Post-test calibrations shall be performed on the components not later than forty-five (45) days after the actual test date. Components requiring calibration are listed in the federal test methods specified in section 5 of this rule.
*These documents are incorporated by reference. Copies may be obtained from the Government Printing Office, 732 North Capitol Street NW, Washington, D.C. 20401 or are available for review and copying at the Indiana Department of Environmental Management, Office of Air Quality, Indiana Government Center North, Tenth Floor, 100 North Senate Avenue, Indianapolis, Indiana 46204.
326 IAC 3-6-3