326 Ind. Admin. Code 20-13.1-13

Current through October 23, 2024
Section 326 IAC 20-13.1-13 - Notification requirements

Authority: IC 13-14-8; IC 13-17-3-4; IC 13-17-3-11

Affected: IC 13-15; IC 13-17

Sec. 13.

(a) The owner or operator of a secondary lead smelter shall comply with all of the notification requirements of the July 1, 2012, edition of 40 CFR 63.9 *.
(b) The owner or operator of a secondary lead smelter shall submit the fugitive dust control standard operating procedures manual required under section 8 of this rule and the standard operating procedures manual for baghouses required under section 9 of this rule to the department along with a notification that the owner or operator of a secondary lead smelter is seeking review and approval of these plans and procedures. The owner or operator of a secondary lead smelter shall submit this notification no later than the effective date of this rule.
(c) For the owner or operator of a secondary lead smelter that commences construction or reconstruction after January 5, 2012, and starts up on or after the effective date of this rule the owner or operator of a secondary lead smelter shall submit this notification on or before one hundred eighty (180) days before startup of the constructed or reconstructed secondary lead smelter.
(d) For an affected source that has received a construction permit from the department on or before January 5, 2012, the owner or operator of a secondary lead smelter shall submit this notification no later than January 7, 2014.

*This document is incorporated by reference. Copies may be obtained from the Government Printing Office, 732 North Capitol Street NW, Washington, D.C. 20401 or are available for review and copying at the Indiana Department of Environmental Management, Office of Air Quality, Indiana Government Center North, Tenth Floor, 100 North Senate Avenue, Indianapolis, Indiana 46204.

326 IAC 20-13.1-13

Air Pollution Control Division; 326 IAC 20-13.1-13; filed Jan 30, 2013, 12:34 p.m.: 20130227-IR-326110774FRA