326 Ind. Admin. Code 20-13.1-1

Current through October 23, 2024
Section 326 IAC 20-13.1-1 - Applicability

Authority: IC 13-14-8; IC 13-17-3-4; IC 13-17-3-11

Affected: IC 13-15; IC 13-17

Sec. 1.

(a) In accordance with the compliance schedule in subsection (c), this rule applies to the following affected emission units at all secondary lead smelters:
(1) Blast, reverberatory, rotary, and electric furnaces.
(2) Refining kettles.
(3) Agglomerating furnaces.
(4) Dryers.
(5) Process fugitive emissions sources.
(6) Buildings containing lead bearing materials.
(7) Fugitive dust sources.
(b) This rule does not apply to primary lead smelters, lead refiners, or lead remelters.
(c) The owner or operator of a secondary lead smelter shall comply with this rule beginning on the applicable dates specified in the following schedule:

(1) Except for Exide Technologies, Inc., Muncie, affected emission units constructed or reconstructed on or before May 19, 2011:January 6, 2014
(2) Compliance with section 3(c) of this rule for affected emission units constructed or reconstructed on or before May 19, 2011, at Exide Technologies, Inc., Muncie:October 1, 2013
(3) Except for the requirements of section 3(c) of this rule, compliance with this rule for affected emission units constructed or reconstructed on or before May 19, 2011, at Exide Technologies, Inc., Muncie:January 6, 2014
(4) All new emission units as defined in section 2 of this rule:Effective date of this rule

(d) The following general provisions of 40 CFR 63, Subpart A* as published in the 2012 edition* of the CFR apply to the owner or operator of a secondary lead smelter subject to this rule:
(1) 40 CFR 63.1 through 40 CFR 63.5 *.
(2) 40 CFR 63.6(a) through 40 CFR 63.6(c) *.
(3) 40 CFR 63.6(e)(1)(iii) *.
(4) 40 CFR 63.6(g) *.
(5) 40 CFR 63.6(i) * and 40 CFR 63.6(j) *.
(6) 40 CFR 63.7(a) through 40 CFR 63.7(d) *.
(7) 40 CFR 63.7(e)(2) through 40 CFR 63.7(e)(4) *.
(8) 40 CFR 63.7(f) through 40 CFR 63.7(h) *.
(9) 40 CFR 63.8(a) * and 40 CFR 63.8(b) *.
(10) 40 CFR 63.8(c)(1)(ii) *.
(11) 40 CFR 63.8(c)(2) through 40 CFR 63.8(c)(8) *.
(12) 40 CFR 63.8(d)(1) and 40 CFR 63.8(d)(2) *.
(13) 40 CFR 63.8(d)(3) *, except for a provision concerning the incorporation of the written procedures of a quality control program into startup, shutdown, or malfunction plans.
(14) 40 CFR 63.8(e) through 40 CFR 63.8(g) *.
(15) 40 CFR 63.9(a) through 40 CFR 63.9(c) *.
(16) 40 CFR 63.9(e) *.
(17) 40 CFR 63.9(g) *.
(18) 40 CFR 63.9(h)(1) through 40 CFR 63.9(h)(3) *.
(19) 40 CFR 63.9(h)(5) * and 40 CFR 63.9(h)(6) *.
(20) 40 CFR 63.9(i) * and 40 CFR 63.9(j) *.
(21) 40 CFR 63.10(a) *.
(22) 40 CFR 63.10(b)(1) *.
(23) 40 CFR 63.10(b)(2)(iii) *.
(24) 40 CFR 63.10(b)(2)(vi) through 40 CFR 63.10(b)(2)(xiv) *.
(25) 40 CFR 63.10(b)(3) *.
(26) 40 CFR 63.10(c)(1) through 40 CFR 63.10(c)(9) *.
(27) 40 CFR 63.10(c)(12) through 40 CFR 63.10(c)(14) *.
(28) 40 CFR 63.10(d)(1) through 40 CFR 63.10(d)(4) *.
(29) 40 CFR 63.10(e) * and 40 CFR 63.10(f) *.
(30) 40 CFR 63.12 through 40 CFR 63.15 *.
(e) The owner or operator of a secondary lead smelter subject to this rule is also subject to Title V permitting requirements under 326 IAC 2-7.
(f) Emission standards in this rule apply at all times.

*These documents are incorporated by reference. Copies may be obtained from the Government Printing Office, 732 North Capitol Street NW, Washington, D.C. 20401 or are available for review and copying at the Indiana Department of Environmental Management, Office of Air Quality, Indiana Government Center North, Tenth Floor, 100 North Senate Avenue, Indianapolis, Indiana 46204.

326 IAC 20-13.1-1

Air Pollution Control Division; 326 IAC 20-13.1-1; filed Jan 30, 2013, 12:34 p.m.: 20130227-IR-326110774FRA