Authority: IC 13-14-8; IC 13-15-2;IC 13-17
Affected: IC 13-15; IC 13-16-2
Sec. 7.
Failure to pay in accordance with the fee payment schedule that results in substantial nonpayment of the fee may result in revocation of the permit.
Nonpayment may result in denial of a permit application or revocation of the permit.
DESCRIPTION | FEE | REFERENCE | |
Part 70 Fees | |||
Minor Source Modification | $793 | 326 IAC 2-7-10.5(e) | |
Renewal with Minor Source Modification | $793 | 326 IAC 2-7-4, 326 IAC 2-7-8, 326 IAC 2-7-10.5(e) | |
Construction Permit | $5,556 | 326 IAC 2-5.1 | |
Construction Permit with PSD or Emission Offset | $9,525 | 326 IAC 2-1.1-5, 326 IAC 2-2, 326 IAC 2-3, 326 IAC 2-5.1 | |
Significant Source Modification | $5,556 | 326 IAC 2-7-10.5(g) | |
Significant Source Modification with PSD or Emission Offset | $9,525 | 326 IAC 2-1.1-5, 326 IAC 2-2, 326 IAC 2-3, 326 IAC 2-7-10.5(g) | |
Renewal with Significant Source Modification | $5,556 | 326 IAC 2-7-4, 326 IAC 2-7-8, 326 IAC 2-7-10.5(g) | |
Renewal with Significant Source Modification and PSD or Emission Offset | $9,525 | 326 IAC 2-1.1-5, 326 IAC 2-2, 326 IAC 2-3, 326 IAC 2-7-4, 326 IAC 2-7-8, 326 IAC 2-7-10.5(g) | |
PAL (Separate fee per PAL pollutant. Maximum combined fee for all PAL pollutants not to exceed $63,500.) | $63 per ton of allowable emissions | 326 IAC 2-2.4, 326 IAC 2-3.4 | |
FESOP Fees | |||
Initial FESOP | $4,762 | 326 IAC 2-8-3 | |
Minor Permit Revision | $793 | 326 IAC 2-8-11.1(d) | |
Renewal with Minor Permit Revision | $793 | 326 IAC 2-8-3, 326 IAC 2-8-7, 326 IAC 2-8-11.1(d) | |
Construction Permit | $5,556 | 326 IAC 2-5.1 | |
Construction Permit with PSD or Emission Offset | $9,525 | 326 IAC 2-1.1-5, 326 IAC 2-2, 326 IAC 2-3, 326 IAC 2-5.1 | |
Significant Permit Revision | $5,556 | 326 IAC 2-8-11.1(f) | |
Significant Permit Revision with PSD or Emission Offset | $9,525 | 326 IAC 2-1.1-5, 326 IAC 2-2, 326 IAC 2-3, 326 IAC 2-8-11.1(f) | |
Renewal with Significant Permit Revision | $5,556 | 326 IAC 2-8-3, 326 IAC 2-8-7, 326 IAC 2-8-11.1(f) | |
Renewal with Significant Permit Revision and PSD or Emission Offset | $9,525 | 326 IAC 2-1.1-5, 326 IAC 2-2, 326 IAC 2-3, 326 IAC 2-8-3, 326 IAC 2-8-7, 326 IAC 2-8-11.1(f) | |
PAL (Separate fee per PAL pollutant. Maximum combined fee for all PAL pollutants not to exceed $63,500.) | $63 per ton of allowable emissions | 326 IAC 2-2.4, 326 IAC 2-3.4 | |
FESOP general permit | $793 | 326 IAC 2-8-18 | |
SSOA Fees | |||
Construction Permit | $5,556 | 326 IAC 2-5.1, 326 IAC 2-9 | |
Industrial or Commercial Surface Coatings | $793 | 326 IAC 2-9-2.5 | |
Surface Coating or Graphic Arts Operations | $793 | 326 IAC 2-9-3 | |
Woodworking Operations | $793 | 326 IAC 2-9-4 | |
Abrasive Cleaning Operations | $793 | 326 IAC 2-9-5 | |
Grain Elevators | $793 | 326 IAC 2-9-6 | |
Sand and Gravel Plants | $793 | 326 IAC 2-9-7 | |
Crushed Stone Processing Plants | $793 | 326 IAC 2-9-8 | |
Ready-mix Concrete Batch Plants | $793 | 326 IAC 2-9-9 | |
Coal Mines and Coal Preparation Plants | $793 | 326 IAC 2-9-10 | |
Automobile Refinishing Operations | $793 | 326 IAC 2-9-11 | |
Degreasing Operations | $793 | 326 IAC 2-9-12 | |
External Combustion Sources | $793 | 326 IAC 2-9-13 | |
Internal Combustion Sources | $793 | 326 IAC 2-9-14 | |
A source may apply for up to four (4) SSOAs on a single SSOA application and the fee is $793 for the application. | |||
Transition Fees | |||
Transition from Part 70 Permit to FESOP | $1,587 | 326 IAC 2-1.1-7.5 | |
All other transition fees are the fees associated with the registration, operating agreement, or type of permit for which an application has been submitted to the department in accordance with 326 IAC 2-1.1-7.5. | |||
MSOP Fees | |||
Initial MSOP | $100 | 326 IAC 2-6.1 | |
Minor Permit Revision | $600 | 326 IAC 2-6.1-6(g) | |
Renewal with Minor Permit Revision | $600 | 326 IAC 2-6.1-7, 326 IAC 2-6.1-6(g) | |
Renewal | $100 | 326 IAC 2-6.1-7 | |
Construction Permit | $3,500 | 326 IAC 2-5.1 | |
Construction Permit with PSD or Emission Offset | $6,000 | 326 IAC 2-1.1-5, 326 IAC 2-2, 326 IAC 2-3, 326 IAC 2-5.1 | |
Significant Permit Revision (no PSD or Emission Offset) | $3,500 | 326 IAC 2-6.1-6(i) | |
Significant Permit Revision with PSD or Emission Offset | $6,000 | 326 IAC 2-1.1-5, 326 IAC 2-2, 326 IAC 2-3, 326 IAC 2-6.1-6(i) | |
Renewal with Significant Permit Revision | $3,500 | 326 IAC 2-6.1-7, 326 IAC 2-6.1-6(i) | |
Renewal with Significant Permit Revision and PSD or Emission Offset | $6,000 | 326 IAC 2-1.1-5, 326 IAC 2-2, 326 IAC 2-3, 326 IAC 2-6.1-7, 326 IAC 2-6.1-6(i) | |
PAL (Separate fee per PAL pollutant. Maximum combined fee for all PAL pollutants not to exceed $40,000.) | $40 per ton of allowable emissions | 326 IAC 2-2.4, 326 IAC 2-3.4 | |
Registration | $600 | 326 IAC 2-5.1-2, 326 IAC 2-5.5 | |
General Permit | $625 | 326 IAC 2-12 | |
Other Fees | |||
Exemption (Exempt Source) | $100 | 326 IAC 2-1.1-3, 326 IAC 2-5.1-1(1) | |
Relocation of a Portable Source (SSOA Source) | $158 | 326 IAC 2-14 | |
Relocation of a Portable Source (MSOP, Registration, or Exempt Source) | $100 | 326 IAC 2-14 | |
Interim Permit (Title V or FESOP) | $793 | 326 IAC 2-13-1 | |
Interim Permit (MSOP) | $500 | 326 IAC 2-13-1 | |
Public Hearing (Title V, FESOP, or SSOA Source) | $793 | 326 IAC 2-7, 326 IAC 2-8, 326 IAC 2-9 | |
Public Hearing (MSOP, Registration, or Exempt Source) | $500 | 326 IAC 2-1.1-3, 326 IAC 2-5.5, 326 IAC 2-6.1 | |
NSPS Review (Title V, FESOP, or SSOA Source) | $793 each | 326 IAC 12-1, 40 CFR 60 | |
NSPS Review (MSOP, Registration, or Exempt Source) | $500 each | 326 IAC 12-1, 40 CFR 60 | |
NESHAP Review (Title V, FESOP, or SSOA Source) | $793 each | 326 IAC 14, 326 IAC 20, 40 CFR 61, 40 CFR 63 | |
NESHAP Review (MSOP, Registration, or Exempt Source) | $500 each | 326 IAC 14, 326 IAC 20, 40 CFR 61, 40 CFR 63 | |
VOC BACT or MACT Review (Title V, FESOP, or SSOA Source) | $952 each | 326 IAC 8-1-6, 326 IAC 2-4.1 | |
VOC BACT or MACT Review (MSOP, Registration, or Exempt Source) | $600 each | 326 IAC 8-1-6, 326 IAC 2-4.1 | |
PSD BACT or LAER Review | |||
2 to 5 Review Analyses (Title V, FESOP, or SSOA source) | $4,762 | 326 IAC 2-2-3, 326 IAC 2-3-3 | |
6 to 10 Review Analyses (Title V, FESOP, or SSOA source) | $9,525 | 326 IAC 2-2-3, 326 IAC 2-3-3 | |
11 or More Review Analyses (Title V, FESOP, or SSOA Source) | $15,875 | 326 IAC 2-2-3, 326 IAC 2-3-3 | |
2 to 5 Review Analyses (MSOP, Registration, or Exempt Source) | $3,000 | 326 IAC 2-2-3, 326 IAC 2-3-3 | |
6 to 10 Review Analyses (MSOP, Registration, or Exempt Source) | $6,000 | 326 IAC 2-2-3, 326 IAC 2-3-3 | |
11 or More Review Analyses (MSOP, Registration, or Exempt Source) | $10,000 | 326 IAC 2-2-3, 326 IAC 2-3-3 | |
Air Quality Impact Study Review | |||
If Applicant Does Analysis (Title V, FESOP, or SSOA Source) | $5,556 | 326 IAC 2-2-5, 326 IAC 2-3-3 | |
If Applicant Does Analysis (MSOP, Registration, or Exempt Source) | $3,500 | 326 IAC 2-2-5, 326 IAC 2-3-3 | |
If OAQ Does Analysis (Title V, FESOP, or SSOA Source) | $9,525 per pollutant | 326 IAC 2-2-5, 326 IAC 2-3-3 | |
If OAQ Does Analysis (MSOP, Registration, or Exempt Source) | $6,000 per pollutant | 326 IAC 2-2-5, 326 IAC 2-3-3 | |
Experimental Trial Approval (Title V, FESOP, or SSOA Source) | $158 | 326 IAC 2-1.1-3(h)(3) | |
Experimental Trial Approval (MSOP, Registration, or Exempt Source) | $100 | 326 IAC 2-1.1-3(h)(3) | |
Source Sampling Test (SSOA Source) | $1,111 | 326 IAC 3 | |
Source Sampling Test (MSOP, Registration, or Exempt Source) | $700 | 326 IAC 3 | |
Annual Fees | |||
Part 70; Limited to $238,125 per year or, for sources emitting more than 100 tons NOx per year and more than 100 tons VOC per year and in serious or severe ozone nonattainment area, $317,500. (Or up to 4,000 tons per year for each pollutant) | $6,100 plus $52.38 per ton for each regulated air pollutant | 326 IAC 2-7 | |
FESOP Annual Fee | $6,100 | 326 IAC 2-8-16(b) | |
FESOP General Permit Annual Fee | $1,587 | 326 IAC 2-8-18 | |
SSOA Crushed Stone Processing Plants, Annual | $1,270 | 326 IAC 2-9-8(b)(3) | |
SSOA Coal Mines and Coal Preparation Plants, Annual | $952 | 326 IAC 2-9-10 | |
MSOP Annual Fee | $200 | 326 IAC 2-6.1 | |
Other Annual Fees | |||
Monitoring Coke Oven Batteries | up to $156,250 | ||
Municipal Solid Waste Incinerator | $31,750 | 326 IAC 2-7-19(c) |
In a conflict between subsections (a) through (o) and this table, a source shall comply with the provisions in subsections (a) through (o).
*This document is incorporated by reference. Copies may be obtained from the Government Publishing Office, www.gpo.gov, or are available for review at the Indiana Department of Environmental Management, Office of Legal Counsel, Indiana Government Center North, 100 North Senate Avenue, Thirteenth Floor, Indianapolis, IN 46204.
326 IAC 2-1.1-7