Current through October 23, 2024
Section 326 IAC 14-9-7 - Compliance scheduleAuthority: IC 13-1-1-4; IC 13-7-7
Affected: IC 13-1-1-1; IC 13-1-1-4; IC 13-7-1-1; IC 13-7-7-2
Sec. 7.
(a) Each owner or operator shall comply with the requirements of 326 IAC 14-9-3 prior to June 30, 1989.(b) Each owner or operator shall comply with the requirements of 326 IAC 14-9-5 prior to November 30, 1988.(c) Each owner or operator shall comply with the requirements of 326 IAC 14-9-4 prior to December 31, 1990, and shall accomplish the following tasks according to the schedule provided in subdivisions (1), (2), (3), and (4) of this section. (1) Submit by August 31, 1988, a compliance plan to the department of environmental management containing specific control measures for achieving compliance.(2) Award contracts for emission control systems or process changes for emission control by August 31, 1989.(3) Begin on-site construction of emission control system or process changes by April 1, 1990.(4) Complete on-site construction of all emission control systems or process changes and achieve final compliance by December 31, 1990.(d) Each owner or operator subject to the provisions of this rule ( 326 IAC 14-9) shall be in compliance with the requirements specified in subsections (a) and (c) of this section if the coke oven by-product recovery plant is not in operation.(e) Each owner or operator shall submit a written statement providing evidence to the commissioner within 30 days of each applicable date specified in subsections (a), and (b), subdivisions (c)(1), (c)(2), (c)(3) and (c)(4) of this section that the requirements of this section have been implemented. Air Pollution Control Board; 326 IAC 14-9-7; filed Apr 13, 1988, 3:30 pm: 11 IR 3016; readopted filed Jan 10, 2001, 3:20 p.m.: 24 IR 1477; errata filed Dec 12, 2002, 3:35 p.m.: 26 IR 1571