Current through October 23, 2024
Section 326 IAC 14-10-5 - Demolition and renovation feesAuthority: IC 13-14-8; IC 13-17-3-4; IC 13-17-3-11
Affected: IC 13-17
Sec. 5.
(a) An owner or operator of a demolition or renovation activity subject to this rule shall pay a fee to the department for each asbestos project for which a notification is required under section 1 of this rule as follows: (1) One hundred fifty dollars ($150) per facility for a demolition or renovation operation involving greater than or equal to:(A) two thousand six hundred (2,600) linear feet of friable ACM on or off pipes;(B) one thousand six hundred (1,600) square feet of friable ACM on or off other facility components; or(C) four hundred (400) cubic feet of friable ACM on or off all facility components.(2) Fifty dollars ($50) per facility for a demolition or renovation operation involving less than: (A) two thousand six hundred (2,600) linear feet of friable ACM on or off pipes;(B) one thousand six hundred (1,600) square feet of friable ACM on or off other facility components; or(C) four hundred (400) cubic feet of friable ACM on or off all facility components.(b) The department shall bill the owner or operator who submits notifications pursuant to section 1 of this rule on a quarterly basis as determined by the number of notifications received during the previous quarter.(c) Fees must be paid:(1) by mail or in person;(3) by check or money order;(4) payable to "Cashier, Indiana Department of Environmental Management"; and(5) no later than thirty (30) days after receipt of billing.Air Pollution Control Board; 326 IAC 14-10-5; filed Nov 30, 1990, 4:20 p.m.: 14 IR 607Filed 5/9/2019, 2:28 p.m.: 20190605-IR-326090363FRA