Authority: IC 4-21.5-2-1; IC 4-21.5-7-7
Affected: IC 4-21.5-3-34; IC 4-21.5-3-35
Sec. 5.
Unless prohibited by statute, the presiding ELJ may grant an extension of time for the filing of any pleading, document, or motion as follows:
315 IAC 1-3-5