312 Ind. Admin. Code 6-8-1

Current through December 4, 2024
Section 312 IAC 6-8-1 - Application of rule

Authority: IC 14-10-2-4; IC 14-28-3-2; IC 14-29-1-8

Affected: IC 14-28; IC 14-29-1

Sec. 1.

(a) This rule establishes standards for determining whether to grant approval for the placement of a permanent structure in Lake Michigan under IC 14-29-1.
(b) If the permanent structure is a marina, approval must be obtained under 312 IAC 6-4 in addition to this rule.
(c) As used in this rule, "permanent structure" means a:
(1) marina;
(2) seawall;
(3) breakwater;
(4) detached breakwater;
(5) jetty;
(6) boat launch;
(7) "z" wall;
(8) binwall;
(9) sinusoidal wall;
(10) bulkhead;
(11) groin;
(12) grout tube;
(13) cable;
(14) pipeline;
(15) wharf;
(16) pier;
(17) piling;
(18) rock revetment; or
(19) similar structure.

312 IAC 6-8-1

Natural Resources Commission; 312 IAC 6-8-1; filed Jan 23, 2001, 10:17 a.m.: 24 IR 1612; readopted filed Jul 28, 2003, 12:00 p.m.: 27 IR 286; readopted filed Sep 28, 2009, 11:57 a.m.: 20091021-IR-312090152RFA
Filed 11/24/2015, 4:05 p.m.:20151223-IR-312150295RFA
Readopted filed 9/23/2021, 9:42 a.m.: 20211020-IR-312210342RFA