312 Ind. Admin. Code 29-33-19

Current through December 4, 2024
Section 312 IAC 29-33-19 - Approved materials for filling intervals between plugs

Authority: IC 14-10-2-4; IC 14-37-3

Affected: IC 14-37

Sec. 19.

(a) This section establishes requirements for filling intervals between plugs required under this rule.
(b) Unless specified otherwise, the uncemented intervals between any plugs required under this rule may be filled with:
(1) pea gravel;
(2) crushed rock;
(3) mud or bentonite gel; or
(4) water.

312 IAC 29-33-19

Natural Resources Commission; 312 IAC 29-33-19; filed 12/1/2017, 10:35 a.m.: 20171227-IR-312160230FRA
Readopted filed 1/17/2023, 1:53 p.m.: 20230215-IR-312220328RFA