Current through December 4, 2024
Section 312 IAC 29-20-10 - Approval of alternate well construction methodsAuthority: IC 14-10-2-4; IC 14-37-3
Affected: IC 14-37
Sec. 10.
(a) The division director may authorize an alternative well construction method if the owner or operator demonstrates the construction method: (1) will not cause the pollution of, endanger, or threaten any underground source of drinking water;(2) will not damage a source of oil, gas, or coal bed methane or result in waste; and(3) is designed to confine formation fluids and injected fluids to the approved interval.(b) Applications for an alternative well construction method shall include the following information: (1) A typical cross section depicting: (A) the various hole and casing sizes proposed;(B) casing setting depths and cementing information for each casing string including tubing and packers, if proposed;(C) coal seams and the lowermost underground source of drinking water; and(D) other water, oil, gas, and coal bed methane formations above the producing interval.(2) A description of the geographical area in which the alternate method is intended to be used.(3) Other information demonstrating how the alternative construction method will:(A) afford protection to underground sources of drinking water; andNatural Resources Commission; 312 IAC 29-20-10; filed 12/1/2017, 10:35 a.m.: 20171227-IR-312160230FRAReadopted filed 1/17/2023, 1:53 p.m.: 20230215-IR-312220328RFA