Section 312 IAC 29-2-79 - "Kick-off point" defined

Authority: IC 14-10-2-4; IC 14-37-3

Affected: IC 14-37

Sec. 79.

"Kick-off point" means the point in the vertical section of a well where the well bore is intentionally deviated from vertical in order to complete a directional or horizontal well.

312 IAC 29-2-79

Natural Resources Commission; 312 IAC 29-2-79; filed 12/1/2017, 10:35 a.m.: 20171227-IR-312160230FRA
Readopted filed 1/17/2023, 1:53 p.m.: 20230215-IR-312220328RFA