Authority: IC 14-10-2-4; IC 14-37-3
Affected: IC 14-37
Sec. 51.
"Dump bailer method" means placement of cement used in plugging a well by using a dump bailer on a wireline.
312 IAC 29-2-51
Authority: IC 14-10-2-4; IC 14-37-3
Affected: IC 14-37
Sec. 51.
"Dump bailer method" means placement of cement used in plugging a well by using a dump bailer on a wireline.
312 IAC 29-2-51