Authority: IC 14-10-2-4; IC 14-37-3
Affected: IC 14-37
Sec. 14.
"Blowout preventer stack" means the assembly of well control equipment including blowout preventers, spools, valves, and nipples connected to the top of the casing head to protect against a blowout.
312 IAC 29-2-14