Section 312 IAC 29-10-4 - Post testing scheduleAuthority: IC 14-10-2-4; IC 14-37-3
Affected: IC 14-37
Sec. 4.
The application shall include a schedule for the following:
(1) The length of time necessary for conducting the testing operations.(2) Actions to be taken upon conclusion of the testing operations and the timing of either: (A) converting the well to a production well or a Class II well; or(B) plugging and abandoning the well.Natural Resources Commission; 312 IAC 29-10-4; filed 12/1/2017, 10:35 a.m.: 20171227-IR-312160230FRAReadopted filed 1/17/2023, 1:53 p.m.: 20230215-IR-312220328RFA