Current through December 4, 2024
Section 312 IAC 22-4-7 - Reports after project completionAuthority: IC 14-10-2-4; IC 14-21-1-25; IC 14-21-1-31
Affected: IC 14-21-1
Sec. 7.
(a) The coordinator must submit a report to the division within sixty (60) days of the earlier of the following events:(1) Completion of the project for cemetery restoration.(2) The expiration of a license, including any period of license renewal, under section 6(b) of this rule.(b) The report must include each of the following: (1) A summary of the work conducted.(2) Documentation for grave memorials that were recovered or restored.(3) A map showing the location of any work.(4) Other information if required by a license issued under section 6 of this rule.(c) The division shall review the report and inform the coordinator whether the: (1) work described meets the standards of the division; and(2) report is complete and acceptable.(d) The division may issue a license to the coordinator for another project or projects for a cemetery restoration, if the division informs the coordinator that the work described in a project report: (1) meets the standards of the division; and(2) is complete and acceptable.(e) Except as provided in subsection (f), the division shall not issue another license to a coordinator under this rule if a coordinator does not submit a report as required by any of the following: (2) During the periods of their effectiveness:(A) SECTION 7(a) of LSA Document #08-899(E); and(B) SECTION 7(a) of LSA Document #09-773(E).(f) The division may issue another license for a cemetery restoration, if a report is submitted after the periods described in subsection (e), and the division determines the delinquent submission of the report did not cause significant harm.Natural Resources Commission; 312 IAC 22-4-7; filed Jan 5, 2011, 3:12 p.m.: 20110202-IR-312100059FRA; readopted filed Sep 19, 2013, 10:16 a.m.: 20131016-IR-312130184RFAReadopted filed 3/26/2019, 3:39 p.m.: 20190424-IR-312190004RFA