312 Ind. Admin. Code 10-2-22

Current through December 4, 2024
Section 312 IAC 10-2-22 - "Flood control project" defined

Authority: IC 14-28-1-5; IC 14-28-3-2

Affected: IC 14-27-7; IC 14-27-7.5; IC 14-28-1-29; IC 14-28-3

Sec. 22.

"Flood control project" means a project approved or required to be approved under IC 14-28-1-29.

312 IAC 10-2-22

Natural Resources Commission; 312 IAC 10-2-22; filed Jul 5, 2001, 9:12 a.m.: 24 IR 3386, eff Jan 1, 2002; readopted filed Jul 21, 2008, 12:00 p.m.: 20080813-IR-312080072RFA
Readopted filed 9/22/2014, 12:34 p.m.: 20141022-IR-312140065RFA
Readopted filed 9/16/2020, 8:17 a.m.: 20201014-IR-312200345RFA