25 Ind. Admin. Code 2-15-4

Current through December 4, 2024
Section 25 IAC 2-15-4 - Subcontractor's prequalification

Authority: IC 4-13-2-9; IC 4-13.6-3-1

Affected: IC 4-13.6; IC 5-16-1-2

Sec. 4.

Subcontractors who intend to perform state work valued at one hundred fifty thousand dollars ($150,000) or more under a prime contractor to be awarded a state contract must be prequalified before the start of the work.

25 IAC 2-15-4

Indiana Department of Administration; Public Works Division Sec O,4; filed Feb 29, 1972, 4:10 p.m.: Rules and Regs. 1973, p.11; filed Feb 3, 1982, 1:05 p.m.: 5 IR 518; readopted filed Nov 20, 2001, 9:30 a.m.: 25 IR 1265; filed Nov 14, 2007, 11:10 a.m.: 20071212-IR-025060515FRA; readopted filed Oct 18, 2013, 1:38 p.m.: 20131113-IR-025130403RFA
Readopted filed 11/4/2019, 3:40 p.m.: 20191204-IR-025190494RFA
Readopted filed 10/25/2024, 12:07 p.m.: 20241120-IR-025240218RFA