210 Ind. Admin. Code 8-4-31

Current through December 4, 2024
Section 210 IAC 8-4-31 - Alternative power source

Authority: IC 11-8-2-5; IC 31-31-8-2

Affected: IC 31-31-8

Sec. 31.

(a) Written policy, procedure, and practice provide that the facility has:
(1) an alternate power source, such as a generator, to maintain essential services in an emergency; and
(2) an active, effective physical plant maintenance program that includes the following:
(A) A proactive, written preventive maintenance plan.
(B) Provisions for emergency repair in life threatening situations.
(C) A reporting or work order request and response system to document and track needed repairs.
(D) Weekly power generator tests and inspections.
(E) Annual load test.
(b) This is a mandatory standard.

210 IAC 8-4-31

Department of Correction; 210 IAC 8-4-31; filed 9/16/2022, 3:13 p.m.: 20221012-IR-210220072FRA