Section 170 IAC 8.5-4-31 - Cost per lotAuthority: IC 8-1-2-47; IC 8-1-2-69; IC 8-1-2-89
Affected: IC 8-1-1-3; IC 8-1-2-89
Sec. 31.
The cost per lot shall be determined by:
(1) the total number of lots to be served by the main extension divided into the cost of the main extension; or(2) the cost of the main extension shall be divided proportionately on the basis of respective lot frontage for all lots to be served by the main extension.Indiana Utility Regulatory Commission; 170 IAC 8.5-4-31; filed Dec 5, 1990, 3:35 p.m.: 14 IR 570; readopted filed Jul 11, 2001, 4:30 p.m.: 24 IR 4233; readopted filed Apr 24, 2007, 8:21 a.m.: 20070509-IR-170070147RFA; readopted filed Aug 2, 2013, 2:16 p.m.: 20130828-IR-170130227RFAReadopted filed 4/11/2019, 9:04 a.m.: 20190508-IR-170190136RFA