Authority: IC 8-1-2-47; IC 8-1-2-69; IC 8-1-2-89
Affected: IC 8-1-1-3; IC 8-1-2-89
Sec. 3.
As used in this rule, "completion date of the main extension" means the date the utility declares the main extension to be in service and releases it for taps.
Indiana Utility Regulatory Commission; 170 IAC 8.5-4-3; filed Dec 5, 1990, 3:35 p.m.: 14 IR 566; readopted filed Jul 11, 2001, 4:30 p.m.: 24 IR 4233; readopted filed Apr 24, 2007, 8:21 a.m.: 20070509-IR-170070147RFA; readopted filed Aug 2, 2013, 2:16 p.m.: 20130828-IR-170130227RFAReadopted filed 4/11/2019, 9:04 a.m.: 20190508-IR-170190136RFA