Authority: IC 8-1-1-3; IC 8-1-2-4; IC 8-1-12
Affected: IC 8-1-12
Sec. 27.
A utility, upon written request for service by an applicant, shall extend a main and connect the applicant free of charge to provide the service requested if:
170 IAC 6-1.5-27
Authority: IC 8-1-1-3; IC 8-1-2-4; IC 8-1-12
Affected: IC 8-1-12
Sec. 27.
A utility, upon written request for service by an applicant, shall extend a main and connect the applicant free of charge to provide the service requested if:
170 IAC 6-1.5-27