Section 170 IAC 4-7-10 - IRP updatesAuthority: IC 8-1-1-3; IC 8-1-8.5-3
Affected: IC 8-1-8.5; IC 8-1.5
Sec. 10.
(a) The utility may provide the director an update regarding substantial, unexpected changes that occur between IRP submissions. Copies of an update shall be provided to the OUCC and other interested parties.(b) Upon the request of the commission or its staff, the utility shall provide updated IRP information to the director, the OUCC, and interested parties.(c) When submitting an update under this section, the utility shall provide the relevant IRP sections with the updated information. The utility shall also provide a separate document clearly itemizing the parts of the IRP that were updated.Indiana Utility Regulatory Commission; 170 IAC 4-7-10; filed 12/5/2018, 11:49 a.m.: 20190102-IR-170180127FRAReadopted filed 4/11/2019, 9:04 a.m.: 20190508-IR-170190136RFA