Authority: IC 8-1-2-6.6
Affected: IC 8-1-2-61; IC 8-1-8.5; IC 8-1-8.7; IC 8-1-27
Sec. 6.
A utility may seek commission approval for the modified use of qualified pollution control property in the utility's coal burning generating facility under section 5 of this rule by filing an appropriate petition with the commission under IC 8-1-2-61 or in the context of a review proceeding under IC 8-1-8.5, IC 8-1-8.7, or IC 8-1-27.
170 IAC 4-6-6