170 Ind. Admin. Code 4-6-19

Current through December 4, 2024
Section 170 IAC 4-6-19 - Ratemaking treatment; testimony and exhibits for subsequent applications

Authority: IC 8-1-2-6.6

Affected: IC 8-1-2; IC 8-1.5-3-8

Sec. 19.

A utility shall submit to the commission, as part of its prefiled written testimony and exhibits in support of its request for ratemaking treatment of additional values of qualified pollution control property under construction under section 18 of this rule, the information, materials, and computations specified in section 12 of this rule.

170 IAC 4-6-19

Indiana Utility Regulatory Commission; 170 IAC 4-6-19; filed Oct 5, 1993, 5:00 p.m.: 17 IR 180; readopted filed Jul 11, 2001, 4:30 p.m.: 24 IR 4233; readopted filed Apr 24, 2007, 8:21 a.m.: 20070509-IR-170070147RFA; readopted filed Aug 2, 2013, 2:16 p.m.: 20130828-IR-170130227RFA
Readopted filed 4/11/2019, 9:04 a.m.: 20190508-IR-170190136RFA