Section 170 IAC 4-6-16 - Ratemaking treatment; preconstruction costs of clean coal technology

Authority: IC 8-1-2-6.1; IC 8-1-2-6.6

Affected: IC 8-1-2; IC 8-1.5-3-8

Sec. 16.

A utility that engages in one (1) or more clean coal technology projects may classify preconstruction costs related to the projects as operating expenses and record these expenses in a deferred account. The utility may seek ratemaking treatment of the preconstruction costs in a general rate case before the commission. If the utility classifies preconstruction costs as operating expenses, the utility shall not record the same amounts as CWIP.