Current through December 4, 2024
Section 170 IAC 4-1.5-1 - DefinitionsAuthority: IC 8-1-2-69
Affected: IC 8-1-2-1; IC 8-1-2-69
Sec. 1.
Definitions.
(A) Where applicable, the definitions set forth in IC 8-1-2-1 shall be applied to these rules [ 170 IAC 4-1.5 ].(B) The term "Commission" means the Indiana utility regulatory commission.(C) The term "new building" means any building or premises containing more than one residential and/or commercial unit for which a local building permit or a certificate of compliance from the Administrative Building Council is issued after the date of effectiveness of these rules [ 170 IAC 4-1.5 ], including trailer courts and similar multiple user installations. In the absence of local or state authority, a new building will be one for which construction began after the date of effectiveness of these rules [ 170 IAC 4-1.5 ], and it shall be the burden of the builder or owner to prove that construction began before effectiveness of these rules [ 170 IAC 4-1.5 ].Indiana Utility Regulatory Commission; No. 35781: Mastermetering Rule 1; filed May 9, 1980, 9:10 am: 3 IR 1075; readopted filed Jul 11, 2001, 4:30 p.m.: 24 IR 4233; readopted filed Apr 24, 2007, 8:21 a.m.: 20070509-IR-170070147RFA; errata filed Jul 21, 2009, 1:33 p.m.: 20090819-IR-170090571ACA; readopted filed Aug 2, 2013, 2:16 p.m.: 20130828-IR- 170130227RFAReadopted filed 4/11/2019, 9:04 a.m.: 20190508-IR-170190136RFA