170 Ind. Admin. Code 4-11-3

Current through December 4, 2024
Section 170 IAC 4-11-3 - No change to other commission processes

Authority: IC 8-1-1-3; IC 8-1-8.5-12.1

Affected: IC 8-1-8.5-12.1; IC 8-1-8.8

Sec. 3.

This rule does not replace other commission requirements, including:

(1) a proceeding requesting a certificate of public convenience and necessity; and
(2) the commission's rule, 170 IAC 4-7, regarding integrated resource planning by an electric utility.

170 IAC 4-11-3

Indiana Utility Regulatory Commission; 170 IAC 4-11-3; emergency rule filed 6/15/2023, 10:24 a.m.: 20230628-IR-170230500ERA (EMERGENCY)
Filed 8/6/2024, 12:23 p.m.: 20240904-IR-170240091FRA