170 Ind. Admin. Code 4-11-1

Current through December 4, 2024
Section 170 IAC 4-11-1 - Policy and scope

Authority: IC 8-1-1-3; IC 8-1-8.5-12.1

Affected: IC 8-1-8.5-12.1; IC 8-1-8.8

Sec. 1.

This rule establishes procedures and guidelines for a public utility's construction, purchase, or lease of SMRs:

(1) in Indiana for the generation of electricity to be directly or indirectly used to furnish public utility service to Indiana customers; or
(2) at the site of a nuclear energy production or generating facility supplying electricity to Indiana retail customers on July 1, 2011.

170 IAC 4-11-1

Indiana Utility Regulatory Commission; 170 IAC 4-11-1; emergency rule filed 6/15/2023, 10:24 a.m.: 20230628-IR-170230500ERA (EMERGENCY)
Filed 8/6/2024, 12:23 p.m.: 20240904-IR-170240091FRA