Authority: IC 8-1-1-3; IC 8-1-2-47
Affected: IC 8-1-2-38
Sec. 9.
Receipt of Schedules. If acknowledgment of receipt of schedule is desired, the letter of transmittal must be sent in duplicate, and one copy will be stamped and returned when passed upon by the Commission.
Indiana Utility Regulatory Commission; No. 17687: Construction And Filing Of Schedules, Rates And Charges By Public Utilities 9; filed Jan 2, 1946, 10:00 am: Rules and Regs. 1947, p. 1768; readopted filed Jul 11, 2001, 4:30 p.m.: 24 IR 4233; readopted filed Apr 24, 2007, 8:21 a.m.: 20070509-IR-170070147RFA; readopted filed Aug 2, 2013, 2:16 p.m.: 20130828-IR-170130227RFAReadopted filed 4/11/2019, 9:04 a.m.: 20190508-IR-170190136RFA