In Gas Plant Instruction 3, "Components of construction cost," the changes set forth in the remainder of this Section are made.
"If the balance for S (Short-term debt balances) exceeds the balance for W (Average balance in construction work in progress plus nuclear fuel in process of refinement, conversion, enrichment and fabrication), the maximum total AFUDC rate to be utilized will be the weighted average short-term debt rate. In instances where this occurs, the entire credit for AFUDC will be recorded in Account 432, Allowance for borrowed funds used during construction - credit."
Ill. Admin. Code tit. 83, § 505.430
Amended at 28 Ill. Reg. 340, effective December 31, 2003