The Commission shall grant a temporary rate increase if the Commission determines that the utility has met the requirements of Section 330.30 and if the Commission deems it to be in the public interest.
Ill. Admin. Code tit. 83, § 330.45
The Commission shall grant a temporary rate increase if the Commission determines that the utility has met the requirements of Section 330.30 and if the Commission deems it to be in the public interest.
Ill. Admin. Code tit. 83, § 330.45