Ill. Admin. Code tit. 83 § 285.6015

Current through Register Vol. 48, No. 48, December 2, 2024
Section 285.6015 - Schedule F-3: Electric Utility Marginal Energy Costs

Electric utilities that own generating assets shall provide on Schedule F-3 the marginal energy costs by costing period (summer, winter, on-peak, off-peak, etc.) for the test year. As work papers supporting this schedule, provide a description of the calculation of the marginal costs, the major assumptions, and support data from production cost studies.

Ill. Admin. Code tit. 83, § 285.6015