Any document that is required to be filed with the Comptroller under Section 20-80 of the Illinois Procurement Code and the SAMS Manual will be considered filed when that document is physically received at the Office of the Comptroller.
Ill. Admin. Code tit. 74, § 255.602
Amended at 36 Ill. Reg. 9762, effective June 20, 2012