Suspension, debarment, nullification of prequalification, modification of prequalification, issuance of conditional prequalification, or denial of prequalification by CDB is also applicable to a DB's separate prequalification as an A/E or contractor with CDB, unless the circumstances are directly related to the design-build process and not to the type of performance provided as an A/E or contractor. In such instances, CDB will issue a written determination supporting its action.
Ill. Admin. Code tit. 44, § 995.400