Within 30 days after the contractor's receipt of the Executive Director's decision on the request for reconsideration, the contractor may request a hearing in writing. All administrative procedures in this Subpart D must be exhausted before CDB will consider the request for a hearing. Hearings shall be conducted in accordance with Hearing Procedures (71 Ill. Adm. Code 100).
Ill. Admin. Code tit. 44, § 950.440
Amended at 25 Ill. Reg. 10741, effective August 10, 2001