Current CDB contracts may be terminated when a contractor is determined to be non-responsible and it is in the public interest to do so, whether or not the non-responsibility has a direct connection with the current contract. Contracts may be terminated with or without further action on the contractor's prequalification.
Ill. Admin. Code tit. 44, § 950.370
Amended at 22 Ill. Reg. 20007, effective November 9, 1998