Ill. Admin. Code tit. 44 § 8.8017

Current through Register Vol. 48, No. 43, October 25, 2024
Section 8.8017 - Special Projects
a) When CDB determines a construction project is so large or specialized that a special prequalification and responsibility determination is appropriate, CDB may set appropriate standards of acceptability different from those set out in this Part. Other provisions of this Part shall remain applicable.
b) Special Prequalification Provisions
1) A public notice will be posted on the CDB Procurement Bulletin and may be published in the CPO-GS Procurement Bulletin and/or in the official State newspaper or may otherwise be made available in print describing the project and any special prequalification requirements.
2) The notice will be published at least 30 days before the date the special prequalification application or the statement of qualifications is due.
3) Prequalification standards may be revised to be more closely related to the needs or environment of the special project (e.g., required vendor and or personnel experience may be limited to a particular size of project, or to experience in a particular environment such as correctional facility work).

Ill. Admin. Code tit. 44, § 8.8017

Adopted at 38 Ill. Reg. 10903, effective 5/7/2014.