Ill. Admin. Code tit. 35, pt. 742, subpt. L, app C, tbl. L

Current through Register Vol. 48, No. 49, December 6, 2024
Table L - J and E Equationsa

Indoor air remediation objectives (mg/m3)

For carcinogenic contaminants

Click here to view image

J&E1

For noncarcinogenic contaminants

Click here to view image

J&E2

To convert mg/m3 from parts per million volume

Click here to view image

Note: 24.45 equals the molar volume of air in liters at normal temperature (25°C) and pressure (760 mmHg).

J&E3

Soil gas remediation objective (mg/m3)

Click here to view image

J & E4

Soil Vapor Saturation Limit

(mg/m3-air)

Click here to view image

J&E5

Groundwater remediation objectives

Click here to view image

J&E6

Attenuation factor

Attenuation factor when the mode of contaminant transport is both diffusion and advection

Qsoil = 83.33 cm3/sec

Click here to view image

J&E7

Attenuation factor when the mode of contaminant transport is diffusion only

Qsoil= 0 cm3/sec

Click here to view image

J&E8

Total overall effective diffusion coefficient for vapor transport in porous media for multiple soil layers (cm2/s)

Click here to view image

J&E9a

In Equation J&E9a, the following condition must be satisfied:

Click here to view image

J&E9b

Source to building separation (cm)

Click here to view image

J&E10

Effective diffusion coefficient for each soil layer (cm2/s)

Click here to view image

J&E11

Surface area of enclosed space at or below grade (cm2)

For a building with a full concrete slab-on-grade

Click here to view image

J&E12a

Surface area of enclosed space at or below grade (cm2)

For a building with a full concrete basement floor and walls

Click here to view image

J&E12b

Building ventilation rate (cm3/s)

Click here to view image

J&E13

Area of total cracks (cm2)

Click here to view image

J&E14

Effective diffusion coefficient through the cracks (cm2/s)

Click here to view image

J&E15

Total porosity

Click here to view image

J&E16

Water-filled soil porosity

Click here to view image

J&E17

Air-filled soil porosity

Click here to view image

J&E18

a This table contains equations based on the assumption that the existing or potential building has a full concrete slab-on-grade or a full concrete basement floor and walls. This table applies only when the existing or potential building has a full concrete slab-on-grade or a full concrete basement floor and walls. Institutional controls under Subpart J are required to develop remediation objectives pursuant to this table. This table does not apply when the existing or potential building has neither a full concrete slab-on-grade nor a full concrete basement floor and walls, such as a building with an earthen crawl space, an earthen floor, a stone foundation, a partial concrete floor, or a sump. In such cases, site evaluators have the option of excluding the indoor inhalation exposure route under Section 742.312, meeting the building control technology requirements under Subpart L, or proposing an alternative approach under Tier 3.

Ill. Admin. Code tit. 35, pt. 742, subpt. L, app C, tbl. L

Added at 37 Ill. Reg. 7506, effective May 15, 2013