Each supplier must monitor, within each compliance period, at the time designated by the Agency by SEP.
BOARD NOTE: Derived from 40 CFR 141.23(j) (2002).
Ill. Admin. Code tit. 35, § 611.610
Amended at 27 Ill. Reg. 16447, effective October 10, 2003
Each supplier must monitor, within each compliance period, at the time designated by the Agency by SEP.
BOARD NOTE: Derived from 40 CFR 141.23(j) (2002).
Ill. Admin. Code tit. 35, § 611.610
Amended at 27 Ill. Reg. 16447, effective October 10, 2003