Ill. Admin. Code tit. 35 § 370.250

Current through Register Vol. 49, No. 2, January 10, 2025
Section 370.250 - Operation During Construction

Specifications shall contain a time schedule describing the plant and collection system operational modes during construction. Where units essential to effluent quality are involved, temporary measures, such as wet hauling, sludge storage lagoons and portable pumping facilities shall be included in the specifications so as to ensure continuity of operation as required and approved by the Agency.

Ill. Admin. Code tit. 35, § 370.250

Amended at 21 Ill. Reg. 12444, effective August 28, 1997