Ill. Admin. Code tit. 35 § 364.403

Current through Register Vol. 48, No. 49, December 6, 2024
Section 364.403 - F5 Factor
a) F5 is a factor which is added for those projects whose priority position is to be retained.
b) The value of F5 will be retained only if the value of the quanitity F1 x F2 x F3 x F6 x F4 is greater than the corresponding quantity for the lowest priority need which has an F5 value greater than zero. If the value of this quantity does not meet this test, F5 for the need will be reduced to zero following the completion of facility planning and subsequent determination of F6.

Ill. Admin. Code tit. 35, § 364.403