Ill. Admin. Code tit. 35 § 270.201

Current through Register Vol. 48, No. 49, December 6, 2024
Section 270.201 - Schedule for Submission of Initial CAAPP Applications for Existing CAAPP Sources

An owner or operator of an existing CAAPP source shall submit to the Agency a complete initial CAAPP application for the source no later than the applicable date specified below:

a) An owner or operator of a CAAPP source with the following SIC codes shall submit its initial complete CAAPP application no later than 3 months after the effective date of the CAAPP: 70, 80, 82, 92, and 97 (institutions); 44, 50, and 51 (material handling); 10, 12, and 14 (mining); and 2951 (asphalt plants);
b) An owner or operator of a CAAPP source with the following SIC codes shall submit its initial complete CAAPP application no later than 6 months after the effective date of the CAAPP: 26 (paper and allied products); 27 (printing and publishing); 46, 494, and 495 (pipelines and utilities other than natural gas pipelines); 491 and 493 (electric utilities); and 32 (mineral products);
c) An owner or operator of a CAAPP source not included in (a) or (b) above or (d) below shall submit its initial complete CAAPP application no later than 9 months after the effective date of the CAAPP; and
d) An owner or operator of a CAAPP source with the following SIC codes shall submit its initial complete CAAPP application no later than 12 months after the effective date of the CAAPP: 20 (agricultural products); 28 (chemicals); 29 (petroleum refining not including 2951); 33 (iron and steel products); and 37 (transportation equipment).

Ill. Admin. Code tit. 35, § 270.201